VOLTSURIA WhatsApp us

Projects

Roofs we have done

Six recent homes, drawn as we laid them out: from a 12-panel terrace in Bangi to a 28-panel bungalow in Subang Jaya. Each took 2 to 3 days on the roof.

A bungalow with a dark grey tiled hip roof carrying two arrays of solar panels, a white car in the porch

Recent installations

  • Bungalow

    2025
    ROADPORCH22 mN
    Area
    SS14, Subang Jaya
    System
    12.3 kWp, 28 panels
    Roof
    Clay tile, hip roof
    On the roof
    3 days
  • Double-storey terrace

    2026
    ROADPORCH7.3 mN
    Area
    Seksyen 9, Bandar Baru Bangi
    System
    5.3 kWp, 12 panels
    Roof
    Concrete tile
    On the roof
    2 days
  • Semi-D

    2026
    ROADPORCH12.5 mN
    Area
    Kota Damansara
    System
    9.7 kWp, 22 panels
    Roof
    Clay tile
    On the roof
    2 days
  • Bungalow

    2024
    ROADPORCH22 mN
    Area
    S2 Heights, Seremban
    System
    11 kWp, 25 panels
    Roof
    Concrete tile, hip roof
    On the roof
    3 days
  • Double-storey terrace

    2025
    ROADPORCH7.3 mN
    Area
    SS2, Petaling Jaya
    System
    6.6 kWp, 15 panels
    Roof
    Clay tile
    On the roof
    2 days
  • Semi-D

    2026
    ROADPORCH12.5 mN
    Area
    Horizon Hills, Iskandar Puteri
    System
    10.1 kWp, 23 panels
    Roof
    Metal deck
    On the roof
    2 days
A grey inverter and a small distribution box on a white car porch wall, conduit running neatly up to the roof

On the ground

Tidy below too

The inverter usually goes on the porch wall, out of the rain, with the conduit run straight up to the roof. Ask to see it at your survey.

Book a survey

A technician cleaning wet solar panels on a metal deck roof with a long soft brush