Projects
Roofs we have done
Six recent homes, drawn as we laid them out: from a 12-panel terrace in Bangi to a 28-panel bungalow in Subang Jaya. Each took 2 to 3 days on the roof.

Recent installations
Bungalow
2025- Area
- SS14, Subang Jaya
- System
- 12.3 kWp, 28 panels
- Roof
- Clay tile, hip roof
- On the roof
- 3 days
Double-storey terrace
2026- Area
- Seksyen 9, Bandar Baru Bangi
- System
- 5.3 kWp, 12 panels
- Roof
- Concrete tile
- On the roof
- 2 days
Semi-D
2026- Area
- Kota Damansara
- System
- 9.7 kWp, 22 panels
- Roof
- Clay tile
- On the roof
- 2 days
Bungalow
2024- Area
- S2 Heights, Seremban
- System
- 11 kWp, 25 panels
- Roof
- Concrete tile, hip roof
- On the roof
- 3 days
Double-storey terrace
2025- Area
- SS2, Petaling Jaya
- System
- 6.6 kWp, 15 panels
- Roof
- Clay tile
- On the roof
- 2 days
Semi-D
2026- Area
- Horizon Hills, Iskandar Puteri
- System
- 10.1 kWp, 23 panels
- Roof
- Metal deck
- On the roof
- 2 days

On the ground
Tidy below too
The inverter usually goes on the porch wall, out of the rain, with the conduit run straight up to the roof. Ask to see it at your survey.
